Sign In | Join Free | My disneypov.com
disneypov.com
Creation Industrial Group Limited
Creation Industrial Group Limited Professional Manufactuer of Metal Roll Forming Machines and Aluminium and Steel Building Materials
Home > Highway Guardrail Roll Forming Machine >

Two Waves Steel Expressway Guard Rail Making Machine with Gear Box Transmission

Creation Industrial Group Limited
Creation Industrial Group Limited
City: Hangzhou
Province/State: Zhejiang
Country/Region: China
Tel: 86-138-67435878
Contact Person:
Mr Aaron

Two Waves Steel Expressway Guard Rail Making Machine with Gear Box Transmission

Brand Name : Creation
Model Number : CYX-85-310
Certification : ISO 9001:2008, CE, SONCAP
Place of Origin : China
MOQ : 1 set
Price : negotiable
Payment Terms : 30% by T/T deposit; 70% by T/T before shipment
Supply Ability : 15 sets per month
Delivery Time : 90 working days after received your payment
Packaging Details : Packed in a 40’GP container
Product Name : Two Waves Steel Expressway Guard Rail Cold Making Machine with Gear Box Transmission
Color : Customized
Size : 18 x 1.8 x 1.7 meters
Weight : Around 18 tons
Working Type : Automatic
Feature : Strong Structure
Contact Now

Two Waves Steel Expressway Guard Rail Cold Making Machine with Gear Box Transmission


Technical Specifications


  • Suitable raw material: galvanized steel coils
  • Thickness: 2.5-4.0mm; yield stress: 235-345MPa
  • Forming speed: around 6-10 meters per minute
  • Main rolling machine motor power: 15KW x 3
  • Hydraulic motor power: 11KW
  • Power supply: 380V/3Phase/50HZ or customized
  • Roller material: Cr12 mould steel with tempering and quenching treatment
  • Rolling shafts material: No. 45 steel with quenching and tempering treatment
  • Rolling station: around 15 sets
  • Punching die material: Cr12 mould steel
  • Cutting blades material: Cr12 mould steel
  • Control system: Mitsubishi PLC touching screen, frequrency inverter, PLC

Main Components of 2 Wave Galvanised Steel Guardrails Production Line


NOItemsQuantity
1Manual /Hydraulic Decoiler1 set
2Feeding Device1 set
3Leveling Device1 set
4Holes Punching Device2 sets
5Main Rollforming Machine1 set
6Hydraulic Cutting Device1 set
7PLC Control System1 set
8Run Out Tables2 pcs

Sales Terms


1. Price: FOB or CFR

2. Payment Term: 30% T/T in advance, 70% T/T before shipment

3. Delivery Time: within 80 Days after receipt of the down payment

4. Warranty: 1 year

5. Installation and Commissioning:

We can send our engineers to customers' site to assist on the installation, commission and trainning to workers.The customer is required to pay 100USD/day to each engineer and afford the food & accommodation and the round-trip tickets.

6. Installation and Trainning Days: about 3-5 days


Guardrail Application in Highway



Machinery Loading for Shipment



China Customized Inflatable Bumper Ball Game Bubble Adult Grass CE supplier

Two Waves Steel Expressway Guard Rail Making Machine with Gear Box Transmission Images

Inquiry Cart 0
Send your message to this supplier
 
From:
Enter your email please.
To: Creation Industrial Group Limited
Subject:
Message:
Characters Remaining: (0/3000)